Friday, August 23, 2019
Hot water System Case Study Example | Topics and Well Written Essays - 1000 words
Hot water System - Case Study Example Subsequently, it refers to the condition where the lost revenue or the cost of production for the water system pipes ought to be considered as such. Question 4: 4. Describe the process you would use in sizing the storm water drainage system for a commercial building? Assume that these buildings dimensions are 100ââ¬â¢ x 200ââ¬â¢ and that the roof will be tapered such that there are two low points, each of equal square footage. What size roof drains are needed? You need to coordinate with the site contractor to determine what size storm water main to run to the front of the building; describe the process you would use to determine the storm water main size and identify the size. 4. It is important to note the system pressures where isolation valve, regulating assemblies and the static pressures at the plumbing zones. A critical roof tank solution is to ensure that the mains water is sufficient and enough to cover or supply the whole building, and thus the aim would ensure suffic ient upward and downward pressure. Question: Section 3: Refer to the Spring Valley plans in D2L and answer the following questions regarding the Drainage, Waste, and Vent systems. (30 Points) Question: 1. Describe the process you would use to determine the total drainage fixture unit (DFU) load on the building sewer for each of the two buildings. What is the total DFU load for each building? (10 points). Referring to the Spring Valley plan the drainage fixture unit it would be important to use the DWV method or the drain, water and vent technique.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.